Exports are either raw materials or manufactured goods. Raw materials are products of the land, such as cotton, timber or rubber. Some raw materials, such as iron ore, come from mines. These raw materials are often exported by the countries that produce them to other countries where they are made into manufactured goods. Some countries produce food for export, for example, meat, sugar, or cereals such as wheat and maize. These countries are agricultural countries. An agricultural country needs fertile land and a good climate. A cold, dry climate is not suitable for agriculture. A country which produces manufactured goods is known as an industrialized country. An industrialized country cannot always produce enough food for its own needs. In this case, it does not export foodstuffs. Instead it has to import them. It relies on exports of manufactured products and pays for imports with the money it earns from the exported goods. The best title of this passage is().
顾客想得到一盘热炒饭,但同时也想知道这盘炒饭是冷的的原因。
下列不属于专用凭证的是()
转账汇款业务中,客户疑似被欺诈,但是坚持转账的,经办员应首先进行“四询问、四核实”,并请客户出示证件,经主管授权后方可办理。
简述对贷款展期的期限和利率规定。
设备监理工程师在设备设计、采购过程中投资管理主要通过()来实现。
下列各选项中,在其他条件不变情况下导致利润减少的因素有()。
足月自然分娩后3天,出现下腹痛,体温正常,恶露多,有臭味,宫底脐上1指,宫体压痛,首先考虑的诊断为( )
应诊断为( )。
公司制企业按净利润的( )提取法定盈余公积金。
暂无相关推荐~
关于工程网络计划的说法,正确的是()。
下面关于工程网络计划的表叙中,正确的是()。
与工程网络计划方法相比,横道图进度计划方法的缺点是不能()。
下面关于工程网络计划的表叙中,正确的是()。
在工程网络计划中,如果某项工作的拖延时间超过其自由时差但没有超过总时差,则()。
下列有关工程网络计划叙述正确的是()。
在网络计划中,工作N最早完成时间为第17天,持续时间为5天。该工作有三项紧后工作,它们的最早开始时间分别为第25天、第27天和第30天,则工作N的自由时差为()...
在某工程网络计划中,已知工作M的总时差和自由时差分别为7天和5天,检查实际进度时发现该工作的持续时间延长了3天,说明此时工作M的实际进度()。
某工程网络计划中,工作M的自由时差为2天,总时差为5天。实施中进度检查时发现该工作的持续时间延长了4天,则工作M的实际进度()。
在工程网络计划中,工作的自由时差是指在不影响()的前提下,该工作可以利用的机动时间。