移动端

  • 题王微信公众号

    题王微信公众号

    微信搜“题王网”真题密题、最新资讯、考试攻略、轻松拿下考试

单选题

In order to link data centers, a customer is evaluating the installation of fiber optic cable between buildings that are 400 meters apart. The installation will require multiple patch panels and cables. Which of the following is the most critical factor to consider for this installation?()

发布日期:2022-07-12

In order to link data centers, a customer is evalu...
A

I/O rate

B

bandwidth

C

signal loss

D

Dense Wavelength Division Multiplexing (DWDM)

标签: "暂无标签"

题王网让考试变得更简单

扫码关注题王,更多免费功能准备上线!

此试题出现在

IBM认证考试

IBM(000-119)

去刷题