移动端

  • 题王微信公众号

    题王微信公众号

    微信搜“题王网”真题密题、最新资讯、考试攻略、轻松拿下考试

多选题

发送对话报价时,可以选择的对手方有哪些?()

发布日期:2021-03-17

发送对话报价时,可以选择的对手方有哪些?()
A

群组

B

ALL

C

机构交易员A

D

机构交易员

试题解析

对话报价

对话报价是指参与者为达成交易而直接向交易对手方作出的、对手方确认即可成交的报价。

中文名
对话报价
类型
全国银行间债券交易参与者的报价

发送

发送拼音是fā sòng,即送出,运送。就是使东西从这里到达那里的一种方式。同时发送也是通信术语之一。

中文名
发送
拼音
fā sòng
其他意思
送交
外文名
Send
词性
动词

方有

方有(1906年-1931年),男,江西省万年县人。生前部队为红十军战士。1931年在1931年参军后无音讯牺牲。

本名
方有
逝世日期
1931年
出生日期
1906年
籍贯
江西省万年县

标签: "暂无标签"

题王网让考试变得更简单

扫码关注题王,更多免费功能准备上线!

此试题出现在

银行内部其他考试

银行间本币市场交易员资格考试

去刷题
热门试题热门资讯 相关试题

地西泮的药理作用机制是(  )。

白斑(  )。

Passage 3Tidal Power on the Cheap?  A  The startup, located on the Orkney Islands, way north of Scotland, has raised £6.2 million to build a working prototype of a floating tidal turbine that it says will be cheaper to install and maintain than others being tested now. The 8-meter-long prototype, ideally, will go into the water at the European Marine Energy Centre (EMEC) Tidal Test Site that sits just down the road from ScotRenewables in 2010. Commercial versions of the turbine will measure up to 40 meters long and weigh 250 tons, but generate 1.2 megawatts of power.  B  “That’s quite impressive when you compare it to others,” said CEO Barry Johnston. “We want to be competitive with offshore wind.” Rather than anchor a permanent turbine on the ocean floor, ScotRenewables will build a floating turbine that is slack moored with chains to an anchor on the sea floor. The body of the turbine-a long 40-meter tube of metal with a point at the end-will face directly into the tide. Below, two turbines attached to fins will convert the power of the tides into electricity. Johnston explained “A 1-meter prototype ScotRenewables is experimenting with in the wave tank is built. It looks like a model rocket with two fins with propellers attached to the ends of the fins.”  C  Tidal is the potentially most predictable, reliable form of renewable energy. With a tide table and computer, ScotRenewables can calculate the power output of a turbine decades in advance. You can’t do that with intermittent, variable sources like wind, solar or wave. Unfortunately, harnessing tidal power is quite difficult. Some of the prototypes that have been tested in the decades are quickly destroyed by rushing tides. Pulling those turbines up from the sea bed and taking them into the shop consumes time and money. Taking the ScotRenewables turbine in for repairs should be easy: maintenance workers would just have to take a boat out, unhook it, and put another in its place while the first is being entangled.  D  Tidal power is also 50 percent stronger at the surface than at the seabed so these turbines should be capable of generating more power. Other companies have tried to create surface tidal turbines before. The difficulty has been keeping the turbine pointed in the direction of the tide. Some get washed away. Other times, the creators build large superstructures around the turbine, which costs money. ScotRenewables says it will come up with control mechanisms and advanced hydrodynamics (i.e., aerodynamics in water) to keep the turbines pointed in the right direction.  E  Scotland is betting heavily on wind and wave power. The notoriously harsh waves and currents of the Pentland Firth, a channel which separates the main body of the U.K. with the Orkneys that is often referred to as the Saudi Arabia of Marine Energy by locals. By 2020, Scotland wants to get half of its power from renewable sources, including large hydroelectric dams. Hydroelectric constitutes about 11 percent of the country’s power now and 9 percent comes from wind and other renewables. A large portion of the new renewable sources of power will come from wind, tidal and wave. Marine energy could provide up to 35 terawatt hours of power to the U.K. by 2020 and 84 terawatt hours of power by 2050, according to Edwina Cook, business development officer at EMEC. The U.K. in 2004 consumed 340 terawatt hours of power. The EMEC has created tidal and wave testing centers for companies to build and validate prototypes. (The Pelamis-that sea snake looking wave power device-was tested at EMEC before commercial rollouts in Portugal.) The government has also passed exceptionally large credits for power providers that put tidal and wave power on the grid. (Prototypes participating in the EMEC test beds are actually connected to the grid and selling small amounts of power.) The hope is that the programme will create jobs, exports and green energy. Offshore, the Dublin based open Hydro Power is already testing a large tidal device that looks like a big rotating fan.  F  Talking about the prototype and commercial power production, however, is easier said than done. ScotRenewables did not like the software simulation tools it found when it first set out. Some software focused on tidal changes; others focused on waves. To build an effective surface tidal turbine, Johnston realized that both tidal and wave power should be taken into account. Thus, it had to build its own tools, which cost several thousands. It also built its own wave tank. It was easier than trying to book time at an EMEC wave tank. The company now hopes to lease time on the tank to other wave companies to generate revenue. And, because ships to deploy tidal and wave devices are in short supply, it is contemplating buying or building its own multi-purpose vessel.  Which paragraph contains the following information?  Write the correct letter, A-F, in boxes 1-4 on your answer sheet.  1. New plan has been made to involve a new factor besides tidal.  2. Damages have happened to the models in the past years.  3. A detailed structure of a model is demonstrated.  4. The immature model is expected to apply at the beginning of the twenty first century after further development.

统计数据都应当被及时公布,提供给全社会的统计信息使用者。(  )[2014年初级,2010年中级真题]

静力稳定度是指静止气层的平衡性质,可分为()三种不同的情形。

劳动合同内容有法定必备条款和当事人任意约定条款之分,下列属于劳动合同法定条款的是()

瘀血证可见(  )。

拱桥墩台除承受拱圈传来的竖直压力,还承受()。

客户变更主营业务的主要情形有( )。

我国旅行证有两种,入出中国国境一年一次有效和两年多次有效。

暂无相关推荐~