单选题 An HP customer would like to discuss IBM system advantages. Their current system platform is a partitioned HP rp8400. Which of the following pSeries systems and advantages should be discussed?()
p630. Maximum partitions, maximum storage, I/O bus speed
p670. Maximum partitions, maximum memory, number of I/O slots
p655. Maximum number of CPUs, processor speed, number of I/O slots
p690. Maximum number of CPUs, peak system bandwidth, peak I/O bandwidth
单选题 What other type of document accompanies the SAPR Guide to provide guidelines and pointers for use during Pre-Sale Reviews? ()
Techdocs
Process Guide
Product Checklists
Site Planning Guide
单选题 Which of the following application development environments are supported on Linux and AIX on pSeries?()
C and C#
C and C++
C++ and RPG
RPG and BASIC
单选题 A customer requires management capabilities for installed pSeries systems via a Microsoft Windows system. Which of the following should be considered?()
TSM
PSSP
WebSM
LoadLeveler
单选题 Which of the following versions of AIX provide both multi-path I/O and dynamic LPAR?()
AIX V5.2
AIX V4.2
AIX V4.3
AIX V5.1
单选题 A customer with p615, p630 and p650 pSeries servers installed and running AIX is considering Linux as an additional environment. Which Linux capabilities can the pSeries Sales Specialist present as choices that are available to enhance the existing systems?()
Linux will be restricted to the p650 system, as it is not supported on the p630.
The customer can run Linux on all the existing systems with or without the presence of AIX.
Linux can run in LPARs on the existing systems but Linux will require the presence of AIX in at least one LPAR.
Linux can be installed on all existing systems but will require the AIX Linux Affinity libraries to boot the systems and run Linux.
单选题 Which interconnect topology is supported for pSeries cluster solutions with Cluster Systems Manager?()
ATM
Ethernet
SP Switch2
Fibre Channel
单选题 When is the most appropriate time to conduct a Pre-install Solution Assurance Review?()
As soon as possible after a firm order
Immediately after the Pre-sale review
As near as possible to the scheduled ship date
After all the items in the site preparation are complete
单选题 A manufacturing business is presently supporting multiple UNIX platforms and considering the advantages of consolidating environments, adding new applications and standardizing on HP-UX with IA-64. Which advantage should be communicated as the most compelling reason to consider pSeries as the platform of choice?()
The pSeries family of servers offers many choices from small entry servers to data-center class systems
pSeries systems support both AIX and Linux operating systems providing a single platform for both environments
AIX contains the tools and utilities necessary to convert all their UNIX software onto a single pSeries server
Thousands of AIX operating system-based applications, middleware, and tools are available today and already optimized
下列属于直线行驶的是()
某通信机房设置七氟丙烷预制灭火系统,该系统应有( )种启动方式。
唐后期书院产生的一个原因是受到()的影响。
压力损失是指()
干旱区造林,整地的主要目的是()
治癫证痰气郁结证,治以()
小学低、中年级的儿童____识记发展最为迅速。
( )是北京市制定的第一个全面保护历史文化名城的法规。
安全带的正确使用:使用前作外观检查,若破损应()使用。
Your network consists of a single Active Directory domain. The domain contains more than 300 group objects. The group objects are divided between several regional organizational units (OUs). You need to create a list of all groups that have names that begin with the word Sales. Which command should you use? ()