移动端

  • 题王微信公众号

    题王微信公众号

    微信搜“题王网”真题密题、最新资讯、考试攻略、轻松拿下考试

单选题

You are the network administrator for TestKing. All network servers run Windows Server 2003, and all are configured to run normal backups. A database server named TestKingSQL runs Microsoft SQL Server 7.0. You discover that some database files on TestKingSQL are not backed up during scheduled backups. You open the Scheduled Job Options dialog box for one of the scheduled backups, as shown in the exhibit. You need to modify the properties of the scheduled backup job to ensure that all database files on TestKingSQL are backed up, even when users are accessing those files. What should you do?()

发布日期:2021-01-28

You are the network administrator for TestKing. Al...
A

Enablethe/SNAPswitchontheruncommand.

B

Enablethe/Vswitchontheruncommand.

C

Configureacopybackup.

D

Configureadailybackup.

题王网让考试变得更简单

扫码关注题王,更多免费功能准备上线!

此试题出现在

CMS专题

CMS专题

去刷题
热门试题热门资讯 相关试题

实施流程银行建设的前提条件是()。

下列有关斗谱编排原则的叙述,错误的是()

《互联网新闻信息服务管理规定》自()起施行。

使用电钻等移动电具时,有时需直接将各线头插人插座内使用,但一定要防止将外壳保护接地线错插在相线插孔中与相线相接触,造成外壳带电的触电事故。

运用()等战术措施,有效控制火势,消灭火灾。

广西根据各地的区域位置、旅游资源特点以及客源市场的分布,划分为(  )四大旅游经济区。

二次支护

某工程项目部承建一段地处北方的新建铁路工程(平面示意图如下图)。该工程标段总长28km,工程范围包括隧道一座、特大桥两座以及路基和少量小桥涵工程,合同工期16个月,年初开工。隧道设计施工方案是:进口单口掘进,出碴全部利用。特大桥设计施工方案是:2号桥利用1号桥钢模板。路基土石方调配方案是:以隧道为界两端各自填挖平衡。施工用电采用网电。施工进行到秋天,因征地原因导致控制性工程工期严重滞后,距铺轨到达标段起点只有6个月,而隧道和1号桥工程量仅完成35%,2号桥仅完成部分桥梁基础。 问题: 1.对平面示意图进行必要的工区划分和线下施工队伍配备。(在答题卡中画出示意图,然后作答) 2.举例说明(各举两例):哪些工程(或工序)可以平行施工?哪些可以顺序施工?哪些必须先后施工? 3.为确保铺轨按期通过本标段,对重点工程施工组织应该如何调整?

下列哪项急性感染性多种神经根炎中的急性感染脱髓鞘多神经根炎(AIDP)型的重要的电生改变:()

不适与某些注射液配伍的特殊输液是()

暂无相关推荐~