移动端

  • 题王微信公众号

    题王微信公众号

    微信搜“题王网”真题密题、最新资讯、考试攻略、轻松拿下考试

单选题

Fins are installed on the fireside of water-tubes used in waste boiler to()

发布日期:2021-03-22

Fins are installed on the fireside of water-tubes ...
A

decrease the velocity of gases flowing past the tubes

B

increase the rate of heat transfer

C

reduce accumulations carbon deposits

D

direct the flow of gases

题王网让考试变得更简单

扫码关注题王,更多免费功能准备上线!

此试题出现在

水路交通运输技能考试

海船船员考试

去刷题
热门试题热门资讯 相关试题