When is it necessary for a TDA to be conducted on an installed IBM DS8800? ()
Which document is the final determination of whether or not a TDA is required for a certainproduct?()
During the TDA, it is determined that Global Mirror will be implemented. The IBM team wants to ensure that they have enough DS8800 fiber links to handle the mirroring workload. Which tool should be used to determine the number of fiber links needed()
In which phase should a TDA be performed of the following?()
In which phase should a TDA be performed?()
A customer has been quoted a DS8800. Which part of the TDA process would ensure that there isenough power in the customer location to operate the system?()
A Technical and Delivery Assessment (TDA) is a structured technical inspection of a completed solution design. After the inspection is complete, what deliverable can the customer expect?()