单选题 What does the ABC designation include for inventory items? ()
Quantity reserved in stock
Quantity expired for a particular Lot
Count Frequency in number of days
Activity Based Costing in capital dollars
单选题 What is the use of work assets on safety plans? ()
The work asset determines to which assets and locations a safety plan can be applied.
Only safety plans with associated work assets can be used in combination with job plans.
The safety plan can only be applied to work orders with the same asset or location associated.
The work assets combined with the work on a job plan dictate which safety information is required.
单选题 Can an item balance ever be allowed to be negative? ()
never
always
depends on which item
depends on if it is allowed in the Inventory Default settings
多选题 Based on which two conditions can master Preventive Maintenance (PM) schedules be created?()
elapsed time since the target start date or completion date of previous work generated by PM
difference between completion date of previous work and system date is equal to Lead Time
elapsed time since the target start date or completion date of the latest work orders for the asset
metered equipment usage since the target start date or completion date of previous work generated by PM
metered equipment usage since the target start date or completion date of the latest work order for the asset
单选题 Which statement is true about items that have been assembled into a kit? ()
Only rotating items can be part of a kit.
Kits can be assembled from lotted items.
Kits can be assembled from items in different storerooms.
Items that have been assembled into kits do not appear in item balances.
多选题 Which two applications can be used to view actual costs for labor, materials, services, and tools?()
Labor Reporting
Quick Reporting
Work Order Tracking
Assignment Manager
Work Order Management
单选题 What must be done in order to automatically close the purchase requisition (PR) after one or more purchase orders (PO) have been created? ()
All PR lines must be assigned to a PO.
The PR must be in the Approved status.
The PR must enter the workflow process.
All manual company input fields must be completed.
单选题 The Client has requested that once Terms and Conditions (Ts Cs) are attached to another record, the Ts Cs should be unchangeable. How is this appropriately accomplished?()
In the Contracts application, delete the Ts Cs from the record and enter a new row.
In the application using the specific Ts Cs, rename the Ts Cs and approve the record.
In the Terms and Conditions Application, uncheck the Editable box on the newly created term.
In the Terms and Conditions Application, change the status of the newly created term to Approved.
单选题 What should be done if a company decides to stop doing business with a vendor? ()
Notify buyers using Workflow.
Delete the Company Master record.
Set the Company record status to DISQUAL.
Check the Disqualified Vendor check box on the Company record.
单选题 At which level do Commodity Codes exist within IBM Maximo Asset Management V6.2? ()
Set level
Site level
System level
Organization level
下列属于直线行驶的是()
某通信机房设置七氟丙烷预制灭火系统,该系统应有( )种启动方式。
唐后期书院产生的一个原因是受到()的影响。
压力损失是指()
干旱区造林,整地的主要目的是()
治癫证痰气郁结证,治以()
小学低、中年级的儿童____识记发展最为迅速。
( )是北京市制定的第一个全面保护历史文化名城的法规。
安全带的正确使用:使用前作外观检查,若破损应()使用。
Your network consists of a single Active Directory domain. The domain contains more than 300 group objects. The group objects are divided between several regional organizational units (OUs). You need to create a list of all groups that have names that begin with the word Sales. Which command should you use? ()