移动端

  • 题王微信公众号

    题王微信公众号

    微信搜“题王网”真题密题、最新资讯、考试攻略、轻松拿下考试

单选题

A database exists as a read-intensive server that is operating with query_cachek_type =DEMAND. The database is refreshed periodically, but the resultset size of the queries does not fluctuate. Note the following details about this environment: A web application uses a limited set of queries. The Query Cache hit rate is high. All resultsets fit into the Query Cache. All queries are configured to use the Query Cache successfully. The response times for queries have recently started to increase. The cause for this has correctly been identified as the increase in the number of concurrent users accessing the web service. Based solely on the information provided, what is the most likely cause for this slowdown at the database level?()

发布日期:2020-04-10

A database exists as a read-intensive server that ...
A

The Query Cache is pruning queries due to an increased number of requests

B

Query_cache_min_res_unit has been exceeded, leading to an increased performance overhead due to additional memory block lookups

C

Mutex contention on the Query Cache is forcing the queries to take longer due to its singlethreaded nature

D

The average resultset of a query is increasing due to an increase in the number of users requiring SQL statement execution

题王网让考试变得更简单

扫码关注题王,更多免费功能准备上线!

此试题出现在

CMS专题

CMS专题

去刷题
热门试题热门资讯 相关试题

在L*a*b*颜色模式中,∆E表达了两个颜色之间的()。

车辆自重与设计标记载重的比值,称为()。

物流服务分销渠道的特点()

“固非敢弄斧班门,然不屑沿街持钵”中的“不屑沿街持钵”意思是()

按照我国《医疗机构水污染物排放标准》(GB18466-2005)的规定,传染病、结核病医疗机构水污染物中的粪大肠菌群排放指标为每升()。

竹叶石膏汤证可见到除下列哪项以外的脉症()

某工程施工合同规定2002年9月28日竣工,在实际施工过程中,先后因下述四项原因导致工程延误30d:(1)2002年5月10日至5月20日因设计变更等待图纸停工10d;(2)2002年6月10日至6月20日因正常阴雨天气影响施工质量,监理工程师下令停工10d;(3)2002年7月10日至7月20日因承包人设备故障而停工10d;(4)2002年7月15日至7月21日因发生不可抗力事件而停工5d。问题:以上情况延期申请至少可以批准多少天?为什么?