移动端

  • 题王微信公众号

    题王微信公众号

    微信搜“题王网”真题密题、最新资讯、考试攻略、轻松拿下考试

问答题

Passage 1  Neither the Americans nor the Russians have the resources to continue human space flight on their own; both sides know they need each other. (1) It’s much easier and cheaper to get used to each other and to blend differing operating styles, languages, and systems on the aged Mir (a Russian word for “peace”) than trying to do that while jointly building a new space station. NASA, in fact, calls its program of shuttle lights to Mir Phase 1 of the International Space Station (ISS). Phase 2 marks the beginning of actual construction. The procedures used to dock the shuttle to Mir, for example, also will be used as a lifeboat for the Island Progress freighters, like the one that crashed into Mir in June, will haul cargo to the ISS. (2) One unintended benefit of Mir’s technical troubles is that they have actually forced the two nations to work much more closely together than they had planned.  Except for a brief period in the 1970s with Skylab, NASA has never operated a space station; the Russians have been running them for years. Astronauts have long been trained intensively to perform specific tasks on shuttle flights lasting 18 days or less. (3) Russian astronauts, however, learn more general skills, since they spend many months in orbit and no one can forecast all the problems they might encounter. As a result of shuttle-Mir experience, NASA is revising astronaut training to include more of the general skills they will need on the ISS.  NASA decided to send astronauts to Mir based on its long record of safe operation. But this year, crews aboard Mir have faced two of the most serious emergencies in the history of human space flight. (4) In February, an oxygen generator caught fire, shooting out 4-foot-long jets of flame like; fire extinguishers were bolted in place, delaying reaction to the fire. In June, a Progress Freighter collided with the Specter module, puncturing it. Specter had to be sealed off to prevent all the air from leaking from the spacecraft. (5) The ancient computer that controls Mir has failed many times, causing most other systems, including the one that keeps the station’s solar panels pointing at the sun, to shut down. One failure in August occurred while a Progress was docking. Last week, the computer crashed again, the carbon dioxide removal system shut down, and a mysterious brown fluid — probably rocket fuel — appeared to leak from the station.

发布日期:2022-07-07

Passage 1  Neither the Americans nor the Russians ...

题王网让考试变得更简单

扫码关注题王,更多免费功能准备上线!

此试题出现在

全国英语等级考试(PETS)

全国英语等级考试(四级)

去刷题
热门试题热门资讯 相关试题

C62AK、C62AT、C62BK、C62BT、C64K、C64H及C64T型敞车局部地板面承受货物重量时,靠车辆两端墙向中部连续装载货物,每端装载长度超过3.8m,装载宽度不小于1.3m、不足2.5m时,全车装载重量不得超过()t。

资产证券化产品按照交易结构不同可以分为()。

运用动态控制原理控制建设工程项目进度时,第一步工作是()。

由于不受作业地点条件的限制,具有良好灵活性特点,目前用于野外露天施工作业比较多电弧焊是()。

邓小平理论的主要内容()

试用期内“走人”,要赔偿用人单位损失吗?

背景资料某框剪结构办公楼,建筑面积18000m2,地下二层,地上十五层,预制桩筏板基础。项目部在编制的“项目环境管理规划”中,提出了现场文明施工的工作内容。现场出入口明显处设置了“五牌一图”。项目部对双排脚手架在基础完成后,架体搭设前;搭设到设计高度后;遇有六级及以上大风和大雨后等情况下均进行了阶段检查和验收,并形成书面检查记录。脚手架在使用过程中,项目部规定对脚手架进行了定期检查。施工单位为从事高处作业的人员提供合格的安全帽、安全带、防滑鞋等必备的个人安全防护用品。项目部对高处作业安全防护设施进行了验收。问题:1.现场文明施工的主要内容有哪些?“五牌一图”具体指什么?2.脚手架还有哪些情况下也要进行阶段检查和验收?3.脚手架工程定期检查应重点检查的项目有哪些?4.高处作业安全防护设施验收的主要项目有哪些?

欲望首先表现为一种痛苦。

树木花枝促花修剪手法最好是()

简述教育法规的特点和作用。