判断题

变更报价书的内容应包括承包人确认的变更处理原则和变更工程量及其变更项目的报价单。

发布日期:2020-04-11

变更报价书的内容应包括承包人确认的变更处理原则和变更工程量及其变更项目的报价单。
A

B

题王网让考试变得更简单

扫码关注题王,更多免费功能准备上线!

此试题出现在

CMS专题

CMS专题

去刷题
热门试题热门资讯 相关试题

Company.com has employed you as their exchange administrator.The Company.com network contains an exchange server 2010 organization that hosts two exchange servers named -ex01 and -ex02.-ex01 and -ex02 is members of a database availability group.during the course of the day you decide to shut down -ex01.You then receive numerous complaints from users stating that they are unable to access their mailboxes.to ensure productivity you need to make sure that all examways users are able to connect to their mailboxes in the event of one mailbox server becoming inaccessible.What should you do?()

安全型无极继电器动接点自由动程为()mm。

透视时X线机工作方式为(),摄影时为()

文件设计通常从设计()文件开始,这种文件最常见的是()文件。

某建筑业企业与A业主订了一项合同总造价为5000万元的建造(施712)合同,合同约定建设期为3年。第1年,实际发生合同成本800万元,年末预计未完成合同尚需发生成本l950万元;第2年,实际发生合同成本l350万元,年末预计未完成合同尚需发生成本900万元。则第2年合同完工进度为()。

新生儿出生体重3.2kg,生后48小时血清胆红素267μmol/L,未结合胆红素249μmol/L,在等待化验检查结果期间,首选治疗方法是()。

通常所说的I/O设备指的是()

培训教材方案审定的“目标导向原则”要求教材审核工作要始终认准培训目标,各项工作要以目标实现为导向。

原位轴压法正式测试前,应取预估破坏荷载的()进行加荷载测试。

患者,男性,25岁,上唇反复肿胀2年,2年前不明原因上唇左侧肿胀,逐渐加重,继而右侧上唇肿胀,无明显不适感,肿胀至今不消退,故来诊。口腔检查:肿胀区唇红黏膜颜色正常,扪诊有垫褥感。该病病理改变应该是()。

暂无相关推荐~

变更报价书的内容应包括承包人确认的变更处理原则和变更工程量及其变更项目的报价单。

变更报价书的内容应包括承包人确认的变更处理原则和变更工程量及其变更项目的报价单。

工程量清单中的单价和合价包括由承包人承担的直接费、间接费、其它费用、税金等全部费用和要求获得的利润以及应由承包人承担的义务、责任和风险所发生的一切费用。

工程量清单中的单价和合价包括由承包人承担的直接费、间接费、其它费用、税金等全部费用和要求获得的利润以及应由承包人承担的义务、责任和风险所发生的一切费用。

非承包人原因引起的工程量增减,该项工程量变化在合同约定幅度以内的,应()单价。

因分部分项工程量清单漏项或非承包人原因的工程变更,造成增加新的工程量清单项目,其对应的综合单价确定方法正确的有()

由于分部分项工程量清单漏项或其他非承包人原因的工程变更,造成工程量清单出现新增项,对于新增项的综合单价的确定方法,下列各项中错误的是()。

合同中因非承包人原因引起的工程量增减,该项工程量变化在合同约定幅度以内的,应执行()

由非承包人原因引起的工程量增减,该项工程量变化在合同约定幅度以内的,应( )。

合同中因非承包人原因引起的工程量增减,该项工程量变化在合同约定幅度以内的,应执行()