移动端

  • 题王微信公众号

    题王微信公众号

    微信搜“题王网”真题密题、最新资讯、考试攻略、轻松拿下考试

单选题

To accomplish user-managed backup for the USERS tablespace, you issued the following command to put the database in backup mode: SQL> ALTER TABLESPACE users BEGIN BACKUP; While copying the file to the backup destination a power outage caused the instance to terminate abnormally. Which statement is true about the next database startup and the USERS tablespace?()

发布日期:2020-04-10

To accomplish user-managed backup for the USERS ta...
A

The database will open, and the tablespace automatically comes out of the backup mode.

B

The database will be mounted, and recovery must be performed on the USERS tablespace.

C

The database will be mounted, and data files in the USERS tablespace must be taken out of the backup mode.

D

The database will not be mounted, and you must restore all the data files for the USERS tablespace from the backup, and perform recovery.

题王网让考试变得更简单

扫码关注题王,更多免费功能准备上线!

此试题出现在

CMS专题

CMS专题

去刷题
热门试题热门资讯 相关试题

化蜡釜温度是多少?

SMC2.0支持按企业结构自定义组织关系,但是用户、MCU、会场等资源同事只可以归属一个组织。

()的优点在于简便易学,容易操作,适应于各期提供的服务效能大致相同、耗费的使用成本较为均衡的固定资产。

个体希望影响和控制他人的心理倾向,称为()。

与mIg共同组成BCR复合物的CD分子是(  )。

关于颈交感干的描述,错误的是()

主要用于液体制剂中有效成分的提取是()

某机电设备安装公司中标一长输管道支线工程某标段,中标工程管道长度为30km。该公司中标签订合同后,拟把工程中的施工作业带清理、修筑施工运输便道、管沟开挖、管沟回填分包给A工程公司,把管道现场防腐和热收缩套(带)补口分包给B专业公司,把管道焊口无损检验分包给C无损检测公司。机电安装公司召集各分包单位,约定了下述事项: 1.各分包单位自行编制分包工程施工组织设计或施工方案,单位内部完成审批程序后交监理审批,将监理审批后的方案报总包单位项目部备案。 2.施工过程中发生的与沿途村民的临时占地、青苗赔偿等沟通协调事项由总包方授权A工程公司负责进行。 根据建设单位的要求,管道工程按照绿色施工的理念组织施工,实现"四节一环保"。总包单位编制了绿色施工方案,把机械设备、机具的节能作为一个重点内容。施工中,发生下述事件: 事件一:施工中检查发现,部分管段准备下沟时,B专业公司已将管段的全部热收缩套(带)补口完成,然而部分管口焊口还未进行检验,造成部分返工。 事件二:长输管道支线路经一个110kV变电站时,施工单位考虑施工方便,将变电站的一片绿地作为施工用地和管段临时堆放场地,受到电力管理部门的处罚。总包单位加强了内、外部沟通和协调,使工程得以顺利进展。 绿色施工的"四节一环保"具体是什么?机械设备、机具的节能措施有哪些?

功能清湿热、除疳热的药是()

以下有关“调节准确度”的说法,错误的是()

暂无相关推荐~