移动端

  • 题王微信公众号

    题王微信公众号

    微信搜“题王网”真题密题、最新资讯、考试攻略、轻松拿下考试

单选题

Following an unscheduled power outage, theadministrator needs to power up an IVM-managed system. For the given system,what is the first step in this process?()

发布日期:2020-04-10

Following an unscheduled power outage, theadminist...
A

Physically press the appropriate button on the system.

B

Physically disconnect and reconnect the power cable on the system.

C

Log into the IVM using a Web Browser, select the managed-system and select the Power on option from the Operations menu.

D

Log into the HMC using a Web Browser, select the managed-system and select the Power on option from the Operations menu.

题王网让考试变得更简单

扫码关注题王,更多免费功能准备上线!

此试题出现在

CMS专题

CMS专题

去刷题
热门试题热门资讯 相关试题

暂无相关推荐~