The space in hatch No.4 tweendeck is too().
The through cargo in No.4 hatch square stands()the way.
The ship will()backward if Hatch No.4 and No.5 are over stowed.
Our starboard derrick boom of hatch No.4 is badly cracked()that it has become entirely useless.
为调整船舶吃水差,现由No.4舱(x1=-32m)移250t货到No.1舱(x5=45m),MTC=230t•m/cm,则船舶的吃水差改变量为()m。
在信令系统中,No.1、No.2、No.3、No.4、No.5与R1、R2及中国1号信令均属随路信令形式。
某轮抵港前dF=5.48m,dA=6.06m,拟在No.1舱和No.4舱间移货以调平船舶吃水,查得在No.1舱加载100t首吃水变化17.59cm,尾吃水变化-7.81cm,No.4舱加载100t首吃水变化-7.58cm,尾吃水变化13.65cm,应移货的数量为()t。
某轮主柴油机在检修过程中,发现曲轴NO.4主轴颈(组合式曲轴)裂纹。经有效的探伤方法进行探伤后,发现深度不大。你认为以下四种修复方案中哪一种最为合理而又符合法规的有关规定。()
Cargo for ()No.4 is to be loaded first.
The space in Hatch No.4 tweendeck is too().